- Client
- Canterbury Regional Council
- Location
- Christchurch
- Services
- Civil engineering
- Status
- Completed in 2019
The Brief
The Seadown Drain was established in the early 1940s with the primary function of draining coastal land to the north of Waitarakao/Washdyke Lagoon, making productive farming possible. However, due to continued coastal erosion and sea level rises, its effectiveness is declining, and the stopbank that protects the land from inundation is also at risk.
Environment Canterbury (ECan) in association with the Waitarakao/Washdyke Taskforce, Timaru District Council, Te Rūnanga O Arowhenua, Department of Conservation and the OTOP Zone Committee, and the Seadown Drainage Rating Distric, ,were investigating options for the future management of Seadown Drain.
Davis Ogilvie was engaged to undertake a high-level assessment of future management options for the Seadown Drain, so that preferred option/s could be progressed to more detailed evaluations.
What We Did
Our engineering team in Timaru provided technical guidance and were supported by expertise in water quality and civil engineering from our team in Christchurch.
We followed a dynamic adaptive pathways planning approach, as described in the Ministry for the Environment’s (2017) coastal hazard guidance, which suggests options remain agile and may change over time.
As a collaborative project, we facilitated a community and expert panel workshop enabling technical experts and representatives from stakeholder groups to have open conversations - sharing knowledge, and understanding perspectives, risks and opportunities.
Future management options included short-term reactive solutions such as maintenance or landward realignment of the drain, through to engineered asset protection such as sea walls, beach renourishment and long-term managed retreat.
We completed an option assessment against factors such as economic cost, potential environmental, social and cultural impacts, and gaps and level of understanding. This resulted in a decision tool/tree to support future decision-making in the community.
Challenges Identified
The decision tool/tree showed potential options against different timeframes, or triggers such as unprecedented flooding, higher than anticipated sea level rise, or a catastrophic failure of the Waitarakao/Washdyke Lagoon barrier beach.
The presence of multiple uncertainties and the intergenerational timeframe of risk mean one of the key challenges to overcome is timely decision-making in a proactive rather than reactive manner.
Key deliverables
The outputs from the workshop discussions, the results of the high-level assessment of options, and our recommendations for next steps were documented in a detailed report. These included further engagement with the community and stakeholders, and the development of an Action Plan.
We're pleased to see the progress, and be a part of, current work to assess the landward movement of the Seadown Drain and stopbank.
For more information
Click here to see the current works (started in 2024).
Visit ECan's website for more information about Waitarakao catchment.