Ravenswood Roading

With meticulous planning and construction, we helped establish a network of roads and roundabouts, redefining accessibility and fostering growth.

Client
Ravenswood Developments
Location
Christchurch
Services
Geotechnical engineeringSurveyingCivil engineeringPlanning and resource management
Status
2014 – ongoing
The Brief

We were responsible for providing comprehensive multidisciplinary services for a significant residential and commercial project in Woodend. To support this development, we were also engaged to establish a network of roads and roundabouts, redefining accessibility and fostering growth.

This transformative project at Ravenswood reflects our dedication to enhancing connectivity and fostering community growth. We’re proud to play a part in shaping this vibrant development. 

What We Did

In collaboration with Abley Consultants, we designed a pivotal 30m roundabout on Rangiora-Woodend Road. Its three-sided layout and connection to a right-of-way optimises traffic flow, prioritises safety, and creates shared spaces for vehicles and pedestrians. 

The innovative double-lane 30m roundabout is customised for B-trains and semi-trailer access. It seamlessly connects State Highway 1 to the bustling commercial area, improving traffic flow and operational efficiency for businesses. 

These roundabouts not only connect areas within Ravenswood but also serve as a future northbound route for traffic from Rangiora. Once the Woodend bypass on the realigned Northern Motorway is completed, they will become vital bypasses for northbound traffic from Christchurch, ensuring seamless transportation and supporting future development. 

Comprehensive construction monitoring, including site inspections, contract administration, and meetings, ensured adherence to the project’s scope, delivering outstanding results.

Stakeholder consultation played a pivotal role, modifying access arrangements based on invaluable community input and managing variations during construction to accommodate a shared cycleway while meeting project timelines.

Overcoming challenging geotechnical conditions required rigorous testing and regular site inspections, upholding the highest standards of pavement design and construction quality.

Project team

Talk to some of the team who helped bring this project to life.
Meet our people
This transformative project at Ravenswood reflects our dedication to enhancing connectivity, fostering community growth, and improving residents’ and businesses’ quality of life. We’re proud to shape this vibrant development.

GET IN TOUCH

Have a project in mind? Get in touch to discuss how we can help.